Davis Aqueduct Reach 1 Parallel Pipeline Project
Specifications
Owner
Engineer
Contractor
The Davis Aqueduct Reach 1 Parallel Pipeline project adds a new large-diameter steel conveyance line to Weber Basin Water Conservancy District’s water delivery system, providing increased capacity and improved seismic resiliency. The District provides water to more than 700,000 residents throughout a large service area in northern Utah’s Davis County. Designed by Brown and Caldwell and installed by Whitaker Construction, the project includes a 2.2-mile parallel steel pipeline and a new 60-mgd pump station. Northwest Pipe Company (NWP) supplied nearly 12,000 LF of 60-, 69-, and 72-inch spiral weld steel pipe, including 182 LF of InfraShield® Geohazard Resistant Steel Pipe Joints for critical tie-ins to concrete vault structures.
Project Design
The existing Davis Aqueduct, constructed of reinforced concrete pipe in the 1950s, runs along the Wasatch Fault. Brown and Caldwell developed the alignment for the new welded steel pipeline to generally parallel the existing aqueduct while mitigating exposure to seismic hazards, liquefaction, and landslide areas. The pipeline crosses beneath Highway 89 and two major canals before terminating at the North Davis Water Treatment Plant.
Addressing Differential Settlement
InfraShield® joints were incorporated where the steel pipeline exits concrete structures. These locations included wall penetrations at the WTP’s vent and raw water inlet diversion structures, as well as at the pump station. A total of 18 InfraShield® joints were installed to meet the project’s specification for seismic-resilient joints at these critical points where up to three inches of differential settlement was
anticipated.
InfraShield® is a patented, fully welded Geohazard Resistant Steel Pipe (GRSP) system designed to improve pipeline performance in ground settlement and seismic applications. Its strain-based design incorporates a small projection in the pipe wall which predictably absorbs ground-induced deformation while maintaining the structural integrity and watertightness of the joint. The contractor reported a
smooth installation process, with crews able to install the joints in the same way as standard lap-welded
pipe.
Custom Fabrication & Project Logistics
NWP also supplied custom fabricated fittings, including elbows, tees, reducers, and vault piping in diameters ranging from 24- to 72-inches. The pipe was manufactured and fabricated at NWP’s plants in Tracy and Adelanto, California, and shipped directly to the jobsite. Close coordination between the manufacturer, engineer, and contractor supported efficient delivery and installation across each stage of
the project.
“This job has had a lot of logistics, including getting all of our pipe from California to Utah over the span of two years,” said Dallen Christensen, Project Manager at Whitaker Construction. “Northwest Pipe Company has done a phenomenal job working with us through shipments and giving us an awesome product to install and help Utah’s infrastructure.”