Tampa Bay Water Project

Owner
City of Tampa, Florida
Engineer
Parsons Brinkenhoff
General Contractor
Garney Construction
Jacking Sub Contractor
E.J.M. Pipe Services, Inc., Lino Lakes, MN
Pipe Size

933 feet of 86″ O. D. Permalok Steel Casing
979 feet of 96″ O. D. Permalok Steel Casing
607 feet of 100″ O. D. Permalok Steel Casing

The Problem

Installing a 25 km section of pipe to move water from the Alafia River to the new regional surface water treatment plant for Tampa Bay Water. Major concerns were adverse tunneling conditions and grueling geology, including limestone, clay and sand.

The Solution

With the assistance of Permalok’s 86″ O. D. steel pipe sections, E.J.M. Pipe Services was able to complete the project on time in August 2002. Today, the South-Central Hillsborough Intertie is an essential element of Tampa Bay Water’s new, interconnected water system.