South Mainland Water Transmission Main

Owner
City of Cocoa, Florida
Engineer
CH2M Hill
General Contractor
Globetec Construction
Jacking Sub Contractor
Huxted Tunneling
Pipe Size

1,000’, 4 individual runs of 66” OD x 1.000 wall

The Problem

Two crossings of I-95 Highway, one crossing of I-95 Ramp and one canal crossing.

The Solution

Using Permalok® Steel Casing Pipe eliminated down time for welding of 1,000’ of 66” x 1.000” thick casing allowing for the critical project to be completed on time without delay and within line and grade. An Iseki Unclemole 67” machine was used on this project.

Photo Gallery