Lake Rathbun Intake Structure Project

Owner
Lake Rathbun Regional Water Association
Engineer
McClure Engineering Company
General Contractor
Huxted Tunneling Inc.
Jacking Sub Contractor
Pipe Size

545’ of 36” OD x .500 wall Coated & Lined per AWWA C210

The Problem

Install a 50’ deep lake tap in lean clay with an underwater recover of the microtunneling machine.

The Solution

Using Permalok®  Steel Casing Pipe, downtime due to welding is eliminated allowing the advancement of the casing pipe in critical conditions. Huxted Tunneling used a 37” Iseki Unclemole machining in the installation.